Offline cache warming

MetaCAD Pocket — marine tools, offline

Voyage tools, calculations and sea service — on iPhone and Android.

Features and platform differences

CBM, stowage factor and mass: which limit comes first

In short

Required cargo volume equals mass multiplied by stowage factor.

MetaCAD Live Notebook

cbm-stowage-mass-v1

Change cargo mass, stowage factor and hold volume. The model shows cubic utilisation and remaining space.

Required volume: 25,200 m³

Inputs
t

Model range: 10 — 80,000 t. Arrow-key step: 100 t

m³/t

Model range: 0.3 — 8 m³/t. Arrow-key step: 0.1 m³/t

m³

Model range: 1,000 — 150,000 m³. Arrow-key step: 1,000 m³

Required volume
25,200 m³

From the initial example: 0 m³

Utilisation
78.8 %
Space remaining
6,800 m³

Broken stowage, hold geometry, parcel segregation, deck strength and weight limits are not included.

Required volume (m³) / Stowage factor (m³/t)

Other inputs held fixed. Diamond = current example.

5,400 → 144,000 m³0.3 m³/t8 m³/t

Current: 1.4 m³/t → 25,200 m³

Chart data
Stowage factor / Required volume
Stowage factor (m³/t)Required volume (m³)
0.35,400
1.26322,725
1.4 ◆25,200
2.22540,050
3.18857,375
4.1574,700
5.11392,025
6.075109,350
7.038126,675
8144,000
What the model shows

A light, bulky cargo can fill the hold before the ship reaches its weight capacity.

Equation
cargo volume = mass · stowage factor

SF is in m³/t and mass in tonnes.

Primary result substitution

18000 × 1.4 ≈ 25200 m³
Cargo mass
18,000 t
Stowage factor
1.4 m³/t
Hold capacity
32,000 m³

Keep or share this example

One saved example per lesson, no account. The share link includes your inputs only when you choose “Copy link”.

Checkpoint

What fills the same hold faster at equal mass?

Model limits

Broken stowage, hold geometry, parcel segregation, deck strength and weight limits are not included.

Change cargo mass, stowage factor and hold volume. The model shows cubic utilisation and remaining space.

What to notice

A light, bulky cargo can fill the hold before the ship reaches its weight capacity.

Where the teaching model ends

Broken stowage, hold geometry, parcel segregation, deck strength and weight limits are not included.

Formulas

Page model
cargo volume = mass · stowage factor
SF is in m³/t and mass in tonnes.

How to use the notebook

Start with the worked scenario, change one slider, and follow the metrics and plot. Then answer the checkpoint. A number without its stated model boundary is not treated as a conclusion.

Try it in a calculator

Questions

FAQ

Can this result be used for a shipboard operation?
No. Broken stowage, hold geometry, parcel segregation, deck strength and weight limits are not included. Use the vessel’s approved documentation and established procedure.
What stays fixed when a slider moves?
Every other input is held constant. That exposes the causal relationship, but it does not turn the model into a digital twin of a particular vessel.

Related lessons

Want the whole system, not single topics?

MetaCAD Academy — training with live calculators and worked examples on real ships.

Browse courses

Sources & method

  • — Thomas, Stowage: The Properties and Stowage of Cargoes.
  • — MetaCAD deterministic educational model; equation and assumptions are displayed with the result.
  • — The vessel’s approved data and operating procedures remain the controlling source for operational decisions.

MetaCAD educational material. An independent professional review of this lesson has not yet been claimed.

By continuing to use this site, you accept essential cookies and anonymous analytics. Learn more